The area has significant gold prospectivity and exploration potential.
Exploration drilling continued at Saraya and Foulata to support a pre-feasibility study for the Block 2 permit area. This study is due to be completed during 2019 and is aimed at improving the mine’s ounce profile from 2020 onwards and potentially extending the life of the mine. The current option on the Siguiri Block 2 considers the trucking of oxide material to the existing process plant to displace marginal ore. The evaluation of this has been completed.
Good accessibility by road. The Siguiri gold mine is found within the Siguiri District in the northeast of the Republic of Guinea, West Africa, about 850km from the capital city of Conakry. The nearest important town is Siguiri (approximately 50,000 inhabitants), located on the banks of the Niger River. Bamako, the capital of Mali is 300km away.
Construction of the Siguiri combination plant was successfully completed in March 2019, and commissioning of the different sections of the plant is underway. The CIL circuit was commissioned in July 2018 and the first gold from it was poured in August 2018. The 30MW power plant was commissioned in October 2018. It is now fully operational providing reliable, low-cost power to the Siguiri mine.
The crushing and milling circuits for the treatment of the hard sulfide ore are currently being commissioned and full ramp-up is expected in the first half of 2019. The focus for the coming year will be to stabilize plant throughput and operating stability as the new plant is commissioned.
Swipe/Scroll for more information >>
Swipe/Scroll for more information >>
Login to i-MINE to contact the profile representative.