In February 2019, Kodal updated the JORC Mineral Resource for Bougouni to 21.3 million tonnes at 1.11% Lithium Oxide Li2O, with 11.6Mt at 1.13% Li2O in the Indicated category and 9.7Mt at 1.08% Li2O in the Inferred category.
This marked a 23% increase versus the original Maiden Mineral Resource released in September 2018, with over 55% of the Resource now in the Indicated category. In November 2023, Kodal released a new JORC Mineral Resource estimate for Bougouni of 31.9Mt at 1.06% Li2O, specific to the Ngoualana and Boumou deposits following additional reverse circulation (RC) and a diamond drilling campaign completed in early 2023. This marked an increase of 40% versus the 2019 MRE. In addition, the MRE update improves Kodal management’s confidence in the previously defined resource at the Ngoualana prospect ahead of DMS mining development in 2024.
London-listed Kodal Minerals is developing a portfolio of critical metals assets to power the global shift to clean energy. Along with its flagship Bougouni Lithium Project in Mali, the Company also has a number of highly prospective gold assets in its diverse portfolio located in West Africa.
Site Access Road
Work on the Bougouni site access road commenced at the end of 2023 and was completed by local Malian contractors in March 2024.
Long Lead Items
In March 2024, the Bougouni Project team, headed up by Jerry Gao and Steve Zaninovich, signed contracts for the purchase of the two main long lead equipment packages: the crushing circuit and the DMS processing equipment.
Crushing Modules
The dual crushing circuit modules contract will be supplied by Beijing High Dynamic Technology Co., Ltd. (BHD), a well recognised supplier of crushing equipment of similar and much larger capacity to numerous projects in China and worldwide. BHD will provide a turnkey design and supply package for the dual crushing equipment modules, including all ancillary equipment, in accordance with the detailed design concept established with DRA Projects in South Africa.
DMS Processing Plant Equipment
The DMS equipment will be supplied by Haiwang Technology Group (Haiwang). The scope of work includes the provision of final detailed design services to provide a fully integrated DMS processing plant, the supply of all processing equipment required for the DMS operation, and the associated electrical, instrumentation and process controls.