As part of its strategy to diversify its energy mix and transition to renewable energy, Burkina Faso inaugurated two solar photovoltaic power plants in December 2023 in the western part of the country. The first plant, located in Kodéni near Bobo-Dioulasso, has an installed capacity of 38 MWp and is expected to generate an average of 73 GWh of electricity per year, enough to supply approximately 42,000 households.
The second plant, in Pâ, has a capacity of 30 MWp, with an estimated annual production of 54.15 GWh, providing electricity to about 31,000 homes. These facilities contribute to reducing Burkina Faso’s dependence on electricity imports and lowering CO₂ emissions by integrating more clean energy into the national grid.
The solar power plants in Bobo-Dioulasso and Pâ are owned by the Société Nationale d’Électricité du Burkina Faso (SONABEL), the state-owned entity responsible for electricity generation, transmission, and distribution in the country. SONABEL plays a crucial role in Burkina Faso’s energy transition by gradually incorporating renewable energy sources to complement the historically fossil-fuel-dependent and imported electricity supply.
The project was financed through a partnership involving multiple financial and development institutions, including the European Union (EU), the French Development Agency (AFD), the African Development Bank (AfDB), and the Global Environment Facility (GEF). These international partners support Burkina Faso’s energy policies, which aim to increase electrification rates while reducing electricity production costs.
Both solar plants benefit from a well-adapted local infrastructure for electricity production and grid integration. At Kodéni (Bobo-Dioulasso), the solar power plant is connected to a substation, allowing efficient electricity transmission to major urban and industrial areas in the region. As Burkina Faso’s second-largest city, Bobo-Dioulasso is a vital economic hub, and improved access to stable and affordable electricity strengthens its economic activities.
In Pâ, the photovoltaic plant is linked to the national grid via an upgraded and modernized transmission line. This infrastructure ensures the effective distribution of electricity to rural and semi-urban areas where energy access remains limited. The development of these plants also required improvements in local infrastructure, including road access and grid connectivity, enhancing the reliability and stability of Burkina Faso’s energy network.
Amount Sought
The project was financed by a consortium of international development partners, including the EU, AFD, AfDB, and GEF. At this stage, no additional direct investment is officially sought, but the Burkinabe government continues to seek funding for similar projects aimed at strengthening the country’s energy independence.